Starter Guide: Denver Zoning for a Custom Home

Zoning for a Custom Home

Zoning dictates so much when it comes to building a custom home that includes how large your house can be, where it sits on the lot, and whether you can add a backyard accessory dwelling unit, and how tall you can go. 

It is important to determine what zoning allows before starting a construction project or purchasing real estate that you hope to build your dream home. 

Parcel Zoning Research 101

Find the zoning for the parcel using Denver’s zoning map or Denver’s Property Map. 

Denver zoning follows a basic formula. For example, E-SU-Dx: E is Urban Edge, SU is Single Unit, D is the lot size category (6,000 square feet), and x marks special provisions tailored to that district. Other neighborhood contexts use U for Urban, S for Suburban, and G for General Urban.

The letter in the middle sets the minimum lot size. A is 3,000 sq ft, B is 4,500, C is 5,500, D is 6,000, E is 7,000, G is 9,000, and H is 10,000. A lot smaller than the minimum may need extra review before you can build, if it is even possible to build on.

Your zone district sets the building form standards: height, setbacks, lot coverage, and garage placement. Make sure that you are using the official Denver Zoning Code when jotting down this information. 

Check For Overlays, Easements, and Special Zoning 

A curveball that can emerge later is special overlays that effect what, where, and style of building. 

Landmark and historic districts have their own path through Denver’s permitting process. 

Floodplains, tree preservation rules, and neighborhood design overlays can also change what your site allows.

City Review Process

Constructing a new home might need a demolition, zoning, building, sewer, and drainage permits. 

Community Planning and Development runs residential, structural, energy, zoning, and zone lot verification reviews. They have a helpful guide.

Zone lot verification confirms your lot legally qualifies as a building site, so request it early.

Gaining the new construction permit is important because trade permit applications need an issued residential construction permit before they can proceed. That means that the electrician and plumber cannot submit their permit paperwork until the main permit has been approved.

Plan for an ADU

A November 2024 amendment allows for accessory dwelling units citywide wherever new single-unit houses are allowed.

Planning or including an ADU in the scope of work can help with futureproofing.

Pre-design Checklist

  1. Find your zone district on Denver’s zoning map.
  2. Read the zoning standards for that district.
  3. Check for overlays, historic status, and floodplain.
  4. Confirm zone lot status.
  5. Schedule time with your designer to collaborate ideas and goals
  6. Figure out a timeline for building 
  7. Determine your budget